Soil and Water Remediation at Rocky Flats

Inside the 903 Pad Tents Soil and water remediation at Rocky Flats is one of the important components in the closure of the site.

FY2003 Accomplishments

  • Disposition 370 sites
    • Eight of the top ten highest risk sites complete
    • After initial characterization and collaboration with state regulators, 255 of the sites are expected to need no further action

  • 903 Pad remediation complete
    • Moving to windblown inner Lip Area
    • 903 outer Lip Area IM/IRA public comment Jan. 2004
    • Lip Area complete July 2004

 

  • For more information on soil and water remediation at Rocky Flats see the 2003 Environmental Report Check out the photo gallery  to see more pictures of soil and water remediation projects at Rocky Flats.

    More information on these projects are available in the Rocky Flats Reading rooms

     

     

Remediation inside the 903 Pad Tent Moving the treatment cell into place at the East Trenches Remediation project (3/99)
Remediating the 903 Pad Construction on the treatment cell at the Solar Ponds Plume (7/99)