View looking northeast of Building 779 before demolition begins (10/99) |
Building 779 demolition progress (10/99) |
Former Building 779 during the final phase of demolition (1/00) |
 |
 |
 |
Progress on the construction of the treatment cell at the Solar Pond Plume site (7/99) |
Construction progress showing the last panel being installed at the Solar Pond Plume site (9/99) |
Overall view showing final phase construction progress at the Solar Pond Plume site (10/99) |
 |
 |
 |
Demolition activity of Building 729 (6/99) |
Building 729 Pad after demolition of the building looking east (6/99) |
Sec. of Energy Richardson and Governor Owens commemorating the "Rock Creek Reserve" |
 |
 |
 |
Installation of the collection sump at the East Trench Project, a collection and treatment system, which will be installed in the 1200 foot long trench (3/99) |
Panel installation at the East Trench Project (4/99) |
Reactor vessels being filled with iron for groundwater treatment at the East Trench Project (4/99) |
 |
 |
 |
Environmental cleanup activities and close-up view taken inside the weather shelter tent of Trench T-1 (7/98) |
Removing drums from Trench T-1 during cleanup (7/98) |
Containment shelter over Trench 1 removed and project completed (4/99) |
 |
 |
 |
Subsurface investigation of Pad 903 |
Mound Site - thermal Desorption of soil project |
Construction progress of the Mound Site Project showing collection units installed for the Groundwater Remediation System (July 1999) |
 |
 |
 |
Aerial view of Rocky Flats looking northwest |
Solar Ponds Debris Removal Project, A/B Ponds Corridor, Before (November 1997) |
Solar Ponds Debris Removal Project, A/B Ponds Corridor, After (February 1998) |